Residence for Mr. P

KHYarchitects

written by
Kim Hyoyoung
photographed by
Kim Bogyong unless otherwise indicated
materials provided by
KHYarchitects
edited by
Park Jiyoun

SPACE August 2025 (No. 693)   

 

As one ascends the hill in Cheongun-dong, a row of similar two-storey brick houses stands atop a retaining wall over 10m high. Of the seven houses built together here in 1987, this house, located at the innermost end, was once called the pine tree house due to two tall pine trees extending over the retaining wall. The client, who had lived here with his parents before moving to the U.S. after getting married, returned and traced the memories of the old house. Renovating the house became a way of reconnecting with severed time. The brick façade, preserved almost entirely as it was when first built, retains the traces of the past, while the already altered interior was reconstructed with a steel frame to meet current structural standards, with metal becoming the material that expresses a new conception of time. Circular steel columns are exposed outside the walls, and the added canopy, eaves, railing, and entrance door are all made of red metal. Together with the glass bricks inside and the glass blocks outside, these red elements resonate with the red bricks, evoking a time when architecture was approximate to craft, juxtaposing the temporalities of brick. A circular exterior wall, built 6m in diameter at the highest point of the retaining wall, serves as a monument to both return and new beginning, finished with a moon jar pieces created by the client¡¯s mother, a moon jar artist. 

    

 ​ 

You can see more information on the SPACE No. August (2025).

Architect

KHYarchitects (Kim Hyoyoung) + Jung Heechul

Design team

Kim Bogyong, Park Sangmin, Ahn Sungwoo

Location

Cheongun-dong, Jongno-gu, Seoul, Korea

Programme

single house

Site area

436.2§³

Building area

152.25§³

Gross floor area

276.78§³

Building scope

B1, 2F

Height

7.9m

Building to land ratio

34.97%

Floor area ratio

55.23%

Structure

masonry, steel frame

Exterior finishing

brick, glass block

Interior finishing

paint, veneered wood, stone, glass brick

Structural engineer

Eden Structural Engineering & Consultant

Mechanical and electrical engineer

Daedo Engineering

Construction

Sewon Design Co.

Design period

Oct. 2023 – May 2024

Construction period

June 2024 – Apr. 2025

Client

Park Jihun

Landscape design

Botanical Studio Sam


Kim Hyoyoung
Kim Hyoyoung studied architecture at Dankook University and Kyonggi University Graduate School of Architecture. After gaining diverse experience at the ateliers of several young architects, he founded KHYarchitects in 2015. He approaches architecture with an empathic sensitivity to the context in which it is produced. He identifies and expresses the underlying character of each situation, posing questions that link architecture with the present moment.